Originally Posted by
gcor
I finally got someone on the phone at the field office. He told me the same thing G posted that they were going to put a depth marker on that I beam. I asked him about putting a piece of pvc over it and he said no need they were planning on getting this done while the water was low. I've got a piece of 10 inch schedule 40 if they don't do something I may donate it it next time I'm down there.