Be very careful if you launch at Sharpsville. The road leading to the launch has a lot of pot holes. The first pot hole right at the gate leading to the launch has a pipe stick up in the pot hole. A real tire buster for sure. The word from the corps is that it will be 3-4 months before they fix the road. Waiting on cold patch.