Thanks Thanks:  0
HaHa HaHa:  0
Page 3 of 3 FirstFirst 123
Results 21 to 23 of 23

Thread: Lake D'Arbonne Launch Repairs

  1. #21
    Join Date
    Oct 2014
    Location
    Bastrop,La
    Posts
    68
    Post Thanks / Like

    Default


    The road going to Stowe Creek would be much easier and cheaper to maintain if it was turned back to gravel. I've seen this happen in other places. Run a road grader over it 4 times a year would work.
    Likes waxnslabs LIKED above post

  2. #22
    Join Date
    May 2008
    Location
    West Monroe, LA
    Posts
    813
    Post Thanks / Like

    Default

    There's another thread that's been created called Lake D'Arbone Maintenance attach Email. If you would like to contribute to bettering the lake type your email address in that thread and I'll fwd you some information.

  3. #23
    Join Date
    May 2008
    Location
    West Monroe, LA
    Posts
    813
    Post Thanks / Like

    Default

    Senator Walsworth has responded thanking some of us for the emails. Again please refer to this Thread : (Lake D'Arbonne Maintenance attach your Email) if you would like to send your comments to him. Strength in numbers getting this done.

Page 3 of 3 FirstFirst 123

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP