A week's worth of wood working before work and here it is a rowing station for the canoe. Should make those long trips a lot shorter. Sorted through a lot of information on oar building and placement of the oarlocks hopefully the rain will pass quickly around here and I can get it on the water and see how it does. Name:  tmp_22527-IMG_20170618_122838960-668641342.jpg
Views: 981
Size:  71.9 KBName:  tmp_22527-IMG_20170618_122954311754434338.jpg
Views: 949
Size:  77.6 KBName:  tmp_22527-IMG_20170618_122954311754434338.jpg
Views: 949
Size:  77.6 KB