I MARK EVENLY AROUND THE PIPE WITH THE SHARPIE. THEN DRILL OUT WITH A 1/8TH DRILL BIT.
ATTACH SOME ELASTIC THROUGH THE 1/8 " HOLE. ATTACH A BEAD INSIDE THE TUBE TO HOLD.
THIS IS HOW I KEEP MY LEADERS STRAIGHT AND SAVE TIME RE-RIGGING.
I CUT A PIECE OF 3IN PVC SCHEDULE 40 PIPE ABOUT 40" LONG. MARK THE END WITH A SHARPIE.
I MARK EVENLY AROUND THE PIPE WITH THE SHARPIE. THEN DRILL OUT WITH A 1/8TH DRILL BIT.
ATTACH SOME ELASTIC THROUGH THE 1/8 " HOLE. ATTACH A BEAD INSIDE THE TUBE TO HOLD.
MARK THE OUTSIDE OF THE TUBE EVERY 4"
DRILL OUT THE HOLES. I DRILL A 1/8 " HOLE , THEN REDRILL A 5/16THS HOLE, THEN REDRILL A 3/8THS HOLE.
HOW THE HOOK LOOKS ON THE TUBE.
HOW THE SWIVEL LOOKS ON THE HOLDER
I HOPE THIS HELPS SOMEONE AS MUCH AS IT HELPS ME.
FINISHED LENGTH 40 " HOLDS LOTS OF LEADERS . KEEPS THEM STRAIGHT AND UNTANGLED. SAVES LOTS OF TIME RERIGGING.
thanks....
just what I need on these cold Michigan days...somethin' to keep me busy until ice out. Gonna have ta make me one o them. Thanks.
Life has many choices, eternity has two...choose wisely.
Unapplied biblical truth is like unapplied paint...how many gallons do you have sittin' around? U.D.
I Am Thinking About Folding Up A Piece Of One Of Those Noodles And Sticking It Inside The Tube. That Way It Would Float If It Blew Out Of The Boat Driving Down The Lake.
Why not just use a long section of pool noodle and T pin the leaders to the side? Seems like a lot less work.
Waterboy1