Sweet. What's the plan to go from 8" block to 2" PVC?
Somebody on here can probably tell ya.
Dd, that's what I did. Moved 12x16 shed from one side of the back yard to the other to get a pool put in. Jacked it and pulled the blocks and sat it down on 4" PVC and rolled it. Pushed it. Pulled it
With a atv. Moved it about a hundred feet.
the view is better from the backroads
Member Of Team GetDaFeeshGrease
Just use pipe hig enough that you can get your jack back under it so you can get the pipe out and reblock.......you were talking two inch pipe.....dont think that will work
I have spent most my life fishing........the rest I wasted.
PROUD MEMBER OF TEAM GEEZER
PICO Lures Field Rep
Thanks, Was just thinking 2 inch would work. It's CHEAPER lol
proud member of "Team Cup"
Your going to need at least three pieces of pipe
I have spent most my life fishing........the rest I wasted.
PROUD MEMBER OF TEAM GEEZER
PICO Lures Field Rep