Ok Folks.
Just talked to the MWCD and Saltfork Park. Here is the schedule for when and how much each lake is being drawn down to.
Draw Down Schedule

Saltfork Lake Nov 1st 5 Ft
Seneca lake Nov 1st 8 Ft
Leesville Lake Nov 1st 5 Ft

Clendening Lake Nov 15th 5 Ft
Peidmont Lake Nov 15th 8 Ft
Atwood Lake Nov 15th 8 Ft
Tappan Lake Nov 15th 8 ft

These dates and levels aren't always in stone but usually never changed. The lakes being drawn down 8 ft will be visited by me to build structure and get my jigs back.